BP-Aral Leipzig upgrades to KPS double wall piping to solve fuel egress issues
Project Overview
BP-Aral approached the KPS team for a quick below ground replacement for their corroding steel pipes on a site in Leipzig Germany which had begun to break down and leak. The original piping had been installed over twenty years ago.
Problem
The previously installed flexible corrugated steel and copper piping had become damaged through corrosion over time, causing pipes to leak. The angle at which the concrete tank sumps had been installed required a flexible pipe replacement. Despite the challenging installation requirements, a short downtime was key to this project.
Solution
KPS plastic piping was installed in long curves to fit the layout of the concrete tank sumps, and a hole was cut in the corner of each sump to allow KPS termination fittings to enter, and to be connected to the tanks. KPS’ double wall piping prevents leakage, while onsite training (provided by OPW) enabled a fast installation with minimal downtime.
Result
KPS provided BP-Aral’s Leipzig site with a corrosion-resistant long-lasting below ground solution that will prevent leakage and continue to perform year after year.